For longer slopes and lower roof pitches contact fabral for other suitable profiles.
Roof panel construction details.
Hori zontal panel lap joints are not acceptable.
Always begin working at the point with the longest peak to eave distance.
Box 435 cottonwood mn 56229.
Wear hearing and eye protection.
Epdm closures and metal top closures shall be caulked around their entire perimeter.
Roof pitch the metal roofing panels shown in this manual require a mini mum slope of 2 per foot to ensure proper drainage.
Paint or prime cut edges to prevent rust.
If yours do not.
Add the metal panels.
Galvanized steel roof panel.
The roofing fascia soffit system shall be installed plumb straight and true to adjacent work.
Circular saw 2 x research source slower than angle grinder but follow same step 2 pre drill holes on the ridges.
475 east 4th st.
Please click on the circled section of the typical building to view its details.
Angle grinder 1 x research source the fastest option.
Most panels come up to 32 feet 9 8 m in length.
Also for exposed fastener panels wall panels tiles soffit fascia copping.
Project panel corrugated 3 ft.
Metal roofing specifications cad pdf drawings testing bim.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Refer to the rain carrying table in this booklet for the maximum allowable panel length per slope that will provide adequate drainage.
The structural insulated panel association sipa is a non profit trade association representing manufacturers suppliers dealer distributors design professionals and builders committed to providing quality structural insulated panels for all segments of the construction industry.
Universal ridge flashing in charcoal.
Take care the first piece is aligned precisely perpendicular square to the edge.
By metal sales.
By amerimax 73 37 63 carton.
Allow for a minimum of 18 inches 46 cm if you need to lap to complete the run.
For longer slopes and lower roof pitches contact fabral for other suitable profiles.
Some panels have pre drilled holes.
Step 1 cut the panels to the desired length.
Panel length per slope that will provide adequate drainage.
Roof clips shall allow for thermal movement and shall be installed at each panel joint.